Results:
- 2.0 % Li2O over 16 meters starting at 30.9 meters down hole (CBP-007)
- Including 3.1 % Li2O over 1.5 meters
- 1.8 % Li2O over 3.0 meters starting at 210.3 meters down hole (GRP-018)
- Including 3.6 % Li2O over 1.5 meters
- 2.0 % Li2O over 6.0 meters starting at 125.0 meters down hole (GRP-013)
- Including 3.2 % Li2O over 1.5 meters
- 2.9 % Li2O over 2.3 meters starting at 84.2 meters down hole (GRP-021)
- Including 3.2 % Li2O over 1.5 meters
- Media Assets can be downloaded here: Snow Lake Lithium – Grass River Drilling Campaign