CN Energy Group. Announces Its 6th Gen Gasification Reactors Have Been Put Into Full Operation At Co.’s Tahe Factory

LISHUI, China, Nov. 25, 2022 /PRNewswire/ — CN Energy Group. Inc. (NASDAQ:CNEY) today announced that its 6th-generation gasification reactors (FLS-VI) have been formally and smoothly put into full

LISHUI, China, Nov. 25, 2022 /PRNewswire/ — CN Energy Group. Inc. (NASDAQ:CNEY) today announced that its 6th-generation gasification reactors (FLS-VI) have been formally and smoothly put into full operation at its Tahe Factory, after completing all acceptance checks on design requirements and passing all tests on safety, efficiency and reliability. This is a crucial achievement of CNEY’s own R&D team that started in May 2020 to revamp and optimize its 5th-generation gasification reactors (FLS-V). The first prototype of FLS-VI was built and installed in September 2021. This was followed by continuous on-site efforts on debugging shortcomings and enhancing performance, which lasted for 14 months of trial operations. In 2023, applications of FLS-VI gasification reactors are expected to be replicated on a large scale within CNEY’s production lines.

Total
0
Shares
Related Posts